West Africa

Aviation Biofuel Ethanol project - Equity - Investment- Partnership
Aviation Bio fuel development – with Grade A off-takers - Carbon saving from 64%- 86%. (Total CAPEX -USD$530 million) Reviewing for sites in West Africa or Asia.
Phase 1 of the project will have a CAPEX of USD$180M this will enable over 381million litres of Ethanol for export and production blending for certified Aviation biofuel "ALT100" . Total project will consist of 200,000 acres of feed stock land, 3 starch plants, 1 Ethanol Plant and 1 Blending plant.. The project includes at least 20% of feedstock to be allocated for consumption.
ASTM International has revised ASTM D7566 Annex A5—the Standard Specification for Aviation Turbine Fuel Containing Synthesized Hydrocarbons—to add ethanol as an approved feedstock for producing alcohol-to-jet synthetic paraffinic kerosene (ATJ-SPK). As a result, sustainable aviation fuel produced from ethanol using an alcohol-to-jet process can be used by commercial airlines in up to 50 percent blends with conventional jet fuel.
Asia and Africa

Under Review - Hotel and shopping mall, R&D centre, Department store, Complex apartments – Indonesia USD$1.6 Billion
Under Review - Hotel and shopping mall, R&D centre,
Department store, Complex apartments –
packaging fee, equity and development

Under Review - Hotel and luxury apartment project in centre of Gangham, Seoul
Under Review -
Packaging and development

Government projects Mobile Revenue Monitoring platforms
Working with technical partners in a few African continents to work towards promoting a full platform Real-time Monitoring and Smart KPIs
CDR Generation
Adaptability to SS7, SIP, Sigtran and VoIP Networks
Capturing Signalling Information and Extracting Call Details
Invoicing Licensed Operators
Monitoring the status of Interconnections
These projects will create an extra monthly revenue of + USD $ 40 million from additional taxes and fees

Noble Sky Castle Margonda Development
Noble Sky Castle Margonda Development

Mountain resort and pool villas
Developers - equity Investors
Capex $550M

Nakambe Safari
Safari wildlife reserve with lodge with spa and restaurant and
20 luxury savannah villas, golf course, golf manors Phased project
Phase 1 on 48,000 Acres
Capex $110M, Feasibility in process
Phase 1 $35M - Equity - Investment- Partnership
Ghana West Africa in partnership with Ghana Tourism Board
IT and development Division -

New investment for AI and IT technology projects in West Africa and Asia
Europe

Mineral water bottling plant UK
Phase 3 of required water testing for this exclusive 400 million year old filtered ancient Archean gneiss, metamorphic beds interspersed with granite intrusions rock water. With the properties found so far this will be one of the most exclusive waters available. Due to the restricted protected area limited supply will be sourced. Asia has already shown interest.

Patented Hearing defender with user true fit confirmation
Further investment for complete set to go for CE approval. Then designated manufacturers will produce on a royalty basis. Striving to make the workplace a safe place.

Coming soon ...Sea energy converter apparatus new Patent. Phase 1 target Zero emission power to over 20 million homes
Soon more details on this great project. It will be EPIC

Zero emission Hydrogen production apparatus for use in generating power, Phase 1 target power to over 10 million homes
Soon more details on this great project. another EPIC adventure

Working towards commercial ZERO CO2 emission waste to energy
Soon more details on this great project. another EPIC adventure
Monroe Mills Inc and companies highlighted previous projects

Greater Accra Ridge Hospital USD $306.5M (Phase 1 $225M) Public
Our first project in West Africa - Includes a new 420-bed building over 29,700 sqm with 12 operating blocks, a treatment block and a cutting-edge maternity ward. In addition, some of the building’s electricity supply is provided by solar power, enabling it to meet environmental standards.
The hospital is the first LEED for Healthcare certified project on the African continent, having earned a Silver rating.

Private projects for Exxon Mobil Aecom and Haliburton USD $450 M
Working with AECOM and Halliburton
We gained Exxon Mobil MPN Approved Contractor rating in July 2013 MPNU/EEPNL in accordance with our DPR permit.
GKI and companies pick of our partners highlighted projects

Brickell City Centre
Americaribe / Bouygues - Brickell City Centre is a new project launched on behalf of SWIRE properties in June 2013. The first phase, consisting of the retail space and revolutionary ‘Climate Ribbon’, has been completed as of late 2016, with the opening commenced on November 3rd, 2016. The 2nd phase involving the construction of residential units and additional office space, has been completed in 2018.
At the heart of the project is four stories of retail and entertainment space, topped by six smaller towers. In its full completion, the complex has two residential towers, two office towers, a wellness tower, a luxury open-air shopping centre and a hotel. The site also has 2 levels of underground parking and covered sidewalks. Pedestrian bridges and walkways provide easy access between the four parcels of the development
1 Open air shopping centre, 120,000 sqft Office space and 2 large residential towers
In total five-million-square-foot complex, opened in late 2016, spans more than nine acres and includes three levels of retail shopping, two office towers and the 352-suite East Hotel, with 500,000 square feet of retail space — both luxury and mid-price — 260,000 square feet of office space and more than 1 million square feet of residential units.

Police towers and residential towers
A technical achievement with limited space and access by ZIec

One World Trade Centre (WTC)
At 1,776 feet tall, One World Trade Centre (WTC) is not only the tallest building in the Western Hemisphere. Its sheer size, geographic constraints, and operational necessities make it easily one of the region’s — if not the nation’s — most complex projects ever built.
In 2004, AECOM Tishman was selected to provide preconstruction and construction management services for the Port Authority of New York and New Jersey’s 104-story One World Trade Center. As the builder of the original Twin Towers in 1973, AECOM Tishman has been working at the WTC site since 2001, assisting with the 9/11 clean-up efforts and managing more than 11 million square feet of new construction